Reserve & Open Time

no data loaded Silver Slips aren't marked — verify before you swap
Reads 16JUL  55  6 or 2026-07-16, 55, 6. Paste several pages at once — repeated dates collapse.
Where do I find this in iCrew?
SchedulesPCSSwap with Pot → select your bid period → Display Pilot Reserve Levels for Category
Select the whole table and copy it. Headers, page breaks and the As-of line are all fine to leave in.
adds a line above
Where do I find this in iCrew?
SchedulesOpen Time MenuOpen Time → set the scroll box to Printer FriendlyActual
Select the whole page and copy it.
Silver Slips. Nothing in this report marks them apart from actual open time, so the app cannot tell either — a trip listed here may be a Silver Slip. Check in iCrew before you swap.
Single days and ranges, in any mix — aug 6, 12, 13-16, 23. A 4-day trip is just aug 1-4. Month carries forward. 7/22 and 2026-07-22 work too.
Opens a pre-filled draft in your mail app — press Send and your inbox keeps the archive.
Type a length 1–5 in Add Trip to test a pickup — Added NR fills in and the totals below move. Weekend Working date - no trip * partial Working dates: Past the last date:
Paste the Reserve Availability report and the Open Time trips, then build the grid.
Working days
Considering
Difference